| No. | Uraian | SAT. | Koef. | Harga Satuan (Rp) |
Jumlah (Rp.) |
Referensi Harga |
|---|---|---|---|---|---|---|
| A | TENAGA KERJA | |||||
| Pekerja | OH | 0,1000 | 150.000 | 15.000 | Link | |
| Tukang Kayu | OH | 0,1000 | 250.000 | 25.000 | Link | |
| Kepala Tukang | OH | 0,0100 | 275.000 | 2.750 | Link | |
| Mandor | OH | 0,0050 | 300.000 | 1.500 | Link | |
| b. Jumlah Harga Pekerja | 44.250 | |||||
| B | BAHAN | |||||
| Kayu Balok 5/7 | m3 | 0,0120 | 3.750.000 | 45.000 | Link | |
| Paku 2"-3" | kg | 0,0200 | 28.000 | 560 | Link | |
| Kayu Papan 3/20 | m3 | 0,0070 | 3.850.000 | 26.950 | Link | |
| a. Jumlah Harga Bahan | 72.510 | |||||
| C | ALAT KERJA | |||||
| Peralatan | Lot | 1,0000 | 10.000 | 10.000 | Link | |
| c. Jumlah Harga Alat | 10.000 | |||||
| d. Total (a+b+c) | 126.760 | |||||
| e. Keuntungan 10% | 12.676 | |||||
| Harga Satuan Pekerjaan (d+e) | 139.436 | |||||
| Pembulatan Harga Harsat | 139.400 | |||||